Tops Project Planning Pads 40 Sheets Per Pad, 4 Pads Per Pack

Tops Project Planning Pads 40 Sheets Per Pad, 4 Pads Per Pack

Sale price  $19.90 Regular price  $28.43
Skip to product information
Tops Project Planning Pads 40 Sheets Per Pad, 4 Pads Per Pack

Tops Project Planning Pads 40 Sheets Per Pad, 4 Pads Per Pack

5 reviews

Sale price  $19.90 Regular price  $28.43
SKU: WBOFFB001AFJPZK
UPC: 25932771026.0
Brand: Tops
Availability: In Stock
Payment methods
  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Visa

Sold by Selectfurniturestore, an authorized reseller.

Returns accepted within 30 days  |  support@soloctfurniturestore.shop

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 1–3 business days
  • Estimated Delivery: 3–7 business days after dispatch
  • Heavy items are freight-shipped & carefully secured to prevent damage
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unassembled & in original packaging

All returns require a Return Authorization (RA) number before sending.
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm, including wood dust, formaldehyde, and certain lacquers or finishes.

www.P65Warnings.ca.gov
🪑

Assembly & Weight Safety

Always follow the included assembly instructions. Ensure all bolts and fittings are fully tightened before use. Do not exceed the stated maximum weight capacity.

Keep children away during assembly. Inspect hardware periodically and re-tighten as needed.

ℹ️

Material & Finish Notice

Wood tones and fabric colors may vary slightly from images due to natural material variation and screen calibration. Surface finishes may require periodic maintenance to preserve appearance and longevity.

Made with care

Great value

Elegant design

Quality materials

Description

Product Descriptiontops Project Planning Pad With Margin Task List - 8.50' X 11.75' - Chipboard - Whitefrom The Manufacturerwide-Margin Planning Pad Is Ideal For Project Notes And Reminders. Unique Sheet Layouts Aid Planning, Design And Communication To Help You Organize Notes And Tasks To Keep Projects Moving. Faintly Printed Horizontal Rules Reduce Visual Distraction And Produce Cleaner Photocopies. Along With The Wide Margin On The Front, A Header At Top Of Sheet Provides Space To Record Date, Project And Page Number. Bottom Box Offers A Place For A Task List. Back Of The Sheet Features Grid Ruling. Heavyweight Paper Prevents Bleed-Through To Next Sheet. Letter-Size Pad Contains 40 Stitched Sheets Of 20 Lb. White Bond Sheets. Letr-Trim Perforations Allow Clean And Easy Sheet Removal. The Heavyweight, 60 Point Chipboard Backer Provides Firm Writing Support.

You may also like!

Explore More!!!

Shoe Cabinets
Shoe Cabinets

Shoe Cabinets

Armoires
Armoires

Armoires

TV Stands & Media Furniture
TV Stands & Media Furniture

TV Stands & Media Furniture

Desk Chairs
Desk Chairs

Desk Chairs

Why Shop With Us?

Free Shipping in USA*
15 Day Return Policy
Modern & Stylish Designs
Best Price Guarantee
Trusted & Verified
Since 2010

Selectfurniture

Modern & Stylish Designs

Helping homes look beautiful for over a decade.
Bringing style, comfort, and quality to every space.